This is a cache of https://planen-bauen.jena.de/en/vbb-wj-14-youth-centre-eastside-and-free-all-day-school-leonardo-wenigenjena. It is a snapshot of the page at 2024-10-29T18:08:56.894+0000.
VBB-Wj 14 Youth centre Eastside and free all-day school Leonardo (Wenigenjena) | Jena Planen und Bauen Dummy link to fix Firefox-Bug: First child with tabindex is ignored

VBB-Wj 14 Youth centre Eastside and free all-day school Leonardo (Wenigenjena)

  • Decision to initiate: 04.09.2008
  • Resolution on approval and display: 10.09.2008
  • Resolution on statute: 25.05.2009
  • Legal force through public announcement: 14.01.2010

The planning objectives were:

  • Designation as an area for public use
  • Construction of a new three-storey building adjacent to the existing building of the Eastside Youth Club (formerly the Post Kindergarten).
  • Supplementing the use of the site with the function of a single-form entry primary and regular school in independent sponsorship (AWO).
  • Redesign of the non-buildable property areas in the sense of painting 2
  • Covering the parking space requirements caused by the project on the building plot itself.

The school is built and put into operation.

The plan documents attached as downloads are for information purposes only. Only the legally binding copy of the plan, which can be viewed at the Urban Planning Department, is authoritative.