Construction sites

Here you will find the current roadworks and traffic obstructions. The list is constantly updated. Unless otherwise indicated, you can get past the roadworks on foot or by bike.

We wish all road users a safe and pleasant journey!

Status: 12.04.2024

Scharnhorststrasse

  • Renovation work on the gas pipeline completed

Winzerlaer Straße

  • Half-sided closure completed

Hermann-Löns-Straße - level with Mühlenstraße

  • Search shaft completed

Fritz-Reuter-Straße

  • Reconstruction of the combined sewer completed.

Ernst-Haeckel-Straße

  • Type: Complete closure
  • Location: between Erbertstraße and Sellierstraße
  • Duration: 15.04. - 30.06.2024
  • Reason: Work on the drinking water pipeline
  • Details: Traffic will be diverted via the following route: Vor dem Neutor - Knebelstraße - Am Eisenbahndamm - Fürstengraben.
    People on foot can can pass the construction site safely.

Naumburger Straße

  • Type: Half-sided closure
  • Location: between Rautal and Flurweg
  • Duration: 16.04. - 18.04.2024
  • Reason: Surface opening for local traffic in Jena
  • Details: Traffic will be guided past the construction site on both sides by means of traffic lights.
  • Note: During this period, Brückenstraße is passable in both directions.

Eastern Löbdergraben

  • Type: Complete closure
  • Location: between Steinweg and Lutherplatz
  • Duration: 15.04. - 09.08.2024
  • Reason: Roadworks and media relocation
  • Details: Traffic will be diverted via the following route: Am Eisenbahndamm - Am Anger - Lutherplatz.
    People on foot use the western side of Löbdergraben.

Keßlerstraße

  • Type: Complete closure
  • Location: between Göschwitzer Straße and Geraer Straße (1st construction phase)
  • Duration: 15.04. - 04.06.2024
  • Reason: fundamental expansion in the area of Grenzstraße
  • Details: A detour will be signposted. Pedestrians can pass the construction site safely.

Karl-Liebknecht-Straße

  • Type: selective restrictions in sections
  • Location: from the junction with Rosenstraße to the junction with Karl-Günther-Straße
  • Duration: 16.04. - 31.05.2024
  • Reason: Maintenance work on the tracks
  • Details: The construction areas (moving construction site) are short and can be avoided with mutual consideration.

Angergasse

  • Type: Complete closure
  • Duration: 17.04.2024
  • Reason: Civil engineering works
  • Details: People on foot can walk around the construction site via the Quergasse.

Brückenstraße / Leibnizstraße

  • Type: Half-sided closure in the form of a one-way street regulation
  • Duration: until 10.05.2024
  • Reason: Laying of district heating pipeline
  • Details: The one-way street is passable in the direction of Kunitz. Out-of-town traffic will be diverted via the street "Am Steinbach".
  • Note: In the period from 03. to 18.04.2024, the one-way street regulation will be temporarily suspended so that Brückenstraße is passable in the meantime. This is due to important work being carried out by Jenaer Nahverkehr on the tracks in Naumburger Straße between Rautal and Flurweg. In order to maintain the flow of traffic, the existing traffic organization will be temporarily suspended. Once the work in Naumburger Straße has been completed, the one-way traffic organization in Brückenstraße will be reactivated.

Dammstraße

  • Type: Complete closure
  • Duration: until 30.05.2024
  • Reason: Laying of pipes and renewal of the road surface
  • Details: The construction work is divided into two construction phases. Pedestrians can pass the construction site safely. A detour for private traffic will be signposted on site.

1st construction phase: Magnus-Poser-Straße to Schenkstraße
2nd construction phase: Schenkstraße to Charlottenstraße


Erlanger Allee - cycle path connection

  • Type: Temporary closure
  • Location: between Lobeda-Ost and Lobeda-West
  • Duration: until 03.05.2024
  • Reason: Remaining work

Erlanger Allee

  • Type: Traffic restrictions
  • Location: from the pedestrian crossing at Paul-Schneider-Straße to the junction with Kastanienstraße
  • Duration: until 19.04.2024
  • Reason: Road surface renovation
  • Details: There will be various construction phases during the construction period. Detour signs will be set up on site. The construction site can be passed safely on foot. For further information, please refer to the graphics.
Umleitungsplan Erlanger Allee
Umleitungsplan Erlanger Allee
Erlanger Allee Bauphase 1
Erlanger Allee Bauphase 1
Erlanger Allee Bauphase 2
Erlanger Allee Bauphase 2
Erlanger Allee Bauphase 3
Erlanger Allee Bauphase 3

Border road

  • Type: Half-sided closure
  • Location: At house numbers 2 - 4
  • Duration: until 26.04.2024
  • Reason: Construction of an apartment building
  • Details: Pedestrians will be guided safely past the construction site using an emergency pedestrian route.

Johannisstrasse

  • Type: Traffic restrictions
  • Location: Eastern Johannisstraße 17 - 22
  • Duration: until 26.04.2024
  • Reason: Remaining work on laying district heating (Stadtwerke Jena)
  • Details: The construction site can be passed safely on foot. Cyclists must push due to insufficient remaining width. Provided the weather cooperates, the construction work can be completed ahead of schedule at the end of March. This means that there should be as little disruption as possible for outdoor catering and visitors to the spring market.

Karl-Liebknecht-Straße

  • Type: Half-sided closure
  • Location: At the level of the Erlenhöfe
  • Duration: 08.04. - 03.05.2024
  • Reason: New sidewalk construction
  • Details: Traffic will be guided by construction site traffic lights. Longer waiting times and obstructions are to be expected.

Lichtenhainer Oberweg

  • Type: Various restrictions
  • Location: Tatzendpromenade junction to access to the P10 zeiss parking lot
  • Duration: until 31.12.2024
  • Reason: Laying of district heating pipeline
  • Details: From 25.03. to 30.06.2024, the work will initially be carried out with the road closed on one side. For this purpose, Lichtenhainer Oberweg will become a one-way street in the direction of Lichtenhain. A detour via Mühlenstraße will be signposted for traffic heading into the city. From July onwards, the Lichtenhainer Oberweg will have to be fully closed in sections. The construction site will gradually work its way from the upper part of Lichtenhainer Oberweg towards Tatzendpromenade. Detour will be signposted via Friedrich-Körnerstrasse, Döbereinerstrasse and Philipp-Müller-Strasse. Stadtwerke Energie Jena-Pößneck asks for your understanding for the restrictions.

Lobeda Ost and Lobeda Altstadt

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 07.06.2024
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot.

Löbichauer Straße

  • Type: Complete closure
  • Location: Lower Löbichauer Straße (Karl-Liebknecht-Straße to Eschenplatz)
  • Duration: until 30.11.2024
  • Reason: Civil engineering works
  • Details: Pedestrians will be safely rerouted.

2x Löbstedter Straße

  • Type: Half-sided closure
  • Location: House numbers 9 - 11
  • Duration: 08.04. - 19.04.2024
  • Reason: Civil engineering work for a media connection
  • Type: Complete closure
  • Location House number 49 a
  • Duration: 08.04. - 19.04.2024
  • Reason: Construction of a domestic drinking water connection
  • Details: Traffic will be diverted via Schlachthofstraße.
  • Note: The buses on lines 43, 430 and 431 will be running on a different route. The bus stops Wiesenstraße, Schlachthofstraße and Löbstedter Straße will be closed (both directions). Replacement stops will be set up in Wiesenstraße and Am alten Gaswerk.

Naumburger Straße

  • Type: Half-sided closure
  • Duration: until 30.04.2024
  • Reason: Reconstruction of the "Stifterstraße" streetcar stop + installation of track replacement
  • Details: During the construction period, a one-way street will be installed from the Zitzmannstraße junction to Altenburger Straße. The one-way street is passable in the direction of the city center. The construction site can be passed safely on foot.
  • Addition: In the period 25.03. - 19.04.2024, additional civil engineering work must be carried out at the local transport construction site. This involves removing large quantities of earth from the construction site. In order to be able to carry out this work using excavators, the road must be fully closed in order to maintain the safety distances. The road will then be closed again on one side only.

Nollendorfer Strasse

  • Type: Full closure
  • Location: between Thomas-Mann-Straße and Dornburger Straße
  • Duration: until 30.05.2024
  • Reason: Major road renovation

2x Oberaue

  • Type: Complete closure
  • Location: From the Saaleeingang Ernst-Abbe-Sportfeld entrance to just before the Lichtenhainer Brücke bridge
  • Duration: until 30.04.2024
  • Reason: Work on the stadium grandstand
  • Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.
  • Type: Access restrictions
  • Duration: until 17.05.2024
  • Reason: Remaining work
  • Details: The mobile traffic light system will be reactivated. Entry to the Oberaue is possible.

Rautal

  • Type: Complete closure
  • Location: between Erich-Kuithan-Straße and Naumburger Straße
  • Duration: 08.04. - 26.04.2024
  • Reason: Road surface renovation (postponed to 2024 due to weather conditions)
  • Details: Traffic coming from Closewitz will be informed of the full closure or diverted at Closewitzer Straße, other traffic coming from Jägerbergstraße/Am Heiligenberg should use the detour via Erich-Kuithan-Straße.

Remderoda

  • Type: Complete closure
  • Location: Road in the direction of Remderoda
  • Duration: until 30.05.2024
  • Reason: Laying of drinking water pipe
  • Details: A detour via Münchenroda will be signposted.

Schroeterstraße

  • Type: Complete closure
  • Location: from the junction with Strigelstraße to the junction with Am Friedensberg
  • Duration: until 30.04.2024
  • Reason: Fundamental expansion of the road
  • Details: A second construction phase for the rest of the road is expected to follow from May 2024

Schützenhofstraße

  • Type: Complete closure
  • Location: At house numbers 36 - 38
  • Duration: 08.04. - 19.04.2024
  • Reason: Construction of a domestic drinking water connection
  • Details: During this time, bus traffic will be routed via Schützenhofstraße to the north, which is why large areas will have to be closed to traffic. Information boards and a detour will be signposted.
  • Please note: The buses on route 15 buses will meanwhile are following a modified route. The bus stops Pfälzer Straße (both directions) and Schützenhofstraße are no longer available. Passengers are requested to use the An der Eule stop and the alternative stops on Ottogerd-Mühlmann-Straße and Schützenhofstraße to board and alight the bus.

Teichgraben

  • Type: Half-sided closure
  • Duration: 08.04. - 24.05.2024
  • Reason: Renovation of the bus stop (accessibility) incl. surface course work
  • Details: Traffic will be maintained by means of one-way traffic regulations. The one-way street can be driven in the direction of Leutragraben. A one-way street will also be set up in the Nonnenplan area.
  • The cab ranks in the Nonnenplan area will be relocated. The replacement locations will be in the Leutragraben area opposite McDonald's and at the beginning of Krautgasse next to the Volksbank.
  • A replacement stop will be set up by local transport in Nonnenplan, further information can be found at www.stadtwerke-jena.de/nahverkehr.
  • Addition: Please do not park any vehicles in the Holzmarkt area. It must be possible for local transport to pass through this area safely and smoothly. The public order office will carry out increased checks in the Holzmarkt area.

Wöllnitz

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 31.05.2024
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot.

Ziegenhain

  • Type: Traffic restrictions
  • Duration: until 30.04.2024
  • Reason: Fiber optic expansion

Göschwitzer Straße

  • Type: Half-sided closure
  • Location: Bridge in the Göschwitzer Straße
  • Duration: 22.04. - 03.05.2024
  • Reason: Repair work on the bridge
  • Details: Traffic will be guided past the construction site by means of mobile traffic lights. People on foot can pass the construction site.

Map overview

Traffic restrictions on roads

The map gives you an overview of current restrictions on the roads in Jena.

Karte bewegen und zoomen: Bitte zusätzlich die Strg-Taste/Command-Taste gedrückt halten oder zwei Finger verwenden.

Restrictions on footpaths and cycle paths

The map gives you an overview of current restrictions on footpaths and cycle paths in Jena.